Technology

Add as a preferred source on Google

Google Cloud and NVIDIA Announce Vera Rubin Infrastructure Availability

NVIDIA projects factory-built Vera Rubin systems could serve workloads at prepared data center sites within 14 days, compared with about six months for a conventional deployment.

Updated 1 min read
Cooling equipment and power infrastructure stand outside a data center in Council Bluffs, Iowa. / TokenPost.ai (macro)
Cooling equipment and power infrastructure stand outside a data center in Council Bluffs, Iowa. / TokenPost.ai (macro)

The companies announced Oct. 21 that NVIDIA Vera Rubin infrastructure was broadly available.

Separately, NVIDIA projects that its factory-assembled Vera Rubin systems could begin serving workloads within 14 days at prepared data center sites. The 14-day deployment target for prepared sites is a projection, not a reported result from an operating facility. NVIDIA compares it with about six months for a conventional deployment and says the estimate assumes site infrastructure is ready.

Related articles

View all