Business

Add as a preferred source on Google

Taiwan's N700ST Test Meets 170 Kph Target for Rail Expansion

The first three trains are scheduled to begin passenger service July 1, 2027; the initial train must pass 69 safety and equipment tests.

Updated 1 min read
A Taiwan High Speed Rail test train runs along the elevated track near Chiayi, Taiwan. / EconoTimes.ai
A Taiwan High Speed Rail test train runs along the elevated track near Chiayi, Taiwan. / EconoTimes.ai

Taiwan High Speed Rail Corp. is preparing a 12-train fleet expansion expected to raise peak-hour capacity by 25%; the company said an N700ST completed a 170 kph mainline test Monday.

The train ran between Zuoying and Chiayi stations in southern Taiwan and reached the run's target speed, THSRC said. This was the N700ST's first mainline test. Taiwan received the first of the 12 ordered trains Aug. 15. It is undergoing safety checks and testing before passenger service.

THSRC ordered the 12 trains from Japan. The first three are scheduled to begin carrying passengers July 1, 2027. All 12 are expected to enter service by September 2028.

Once the full order is in service, THSRC expects its fleet to reach 46 trains and peak-hour capacity to rise by 25%. The first train must pass 69 safety and equipment tests before it can carry passengers. Checks include the braking, door and electrical systems, onboard computers, automatic train control and air conditioning. The company said the rollout is still on schedule.

Related articles

View all