Patagonia Gold agreed to buy the Don Sixto gold project in Argentina for US$14.5 million in staged cash payments, with a royalty on future output, adding an asset whose advancement would require further legal, permitting and technical work, the company said Nov. 19.
Patagonia Gold Six Inc., a wholly owned subsidiary, signed the agreement with subsidiaries of Pan American Silver to acquire Cognito Limited. Cognito holds the project and surface land through its Argentine branch. The proposed acquisition has not closed and remains subject to customary conditions.
The payment plan calls for US$2 million at closing. Another US$5 million is due after specified legislative, regulatory or permitting milestones, payable within four months of the relevant milestone, or by the fourth anniversary of closing, whichever comes first. The remaining US$7.5 million is payable within six months after commercial production begins. A 2.25% net smelter return royalty would apply to future production from the project’s mining concessions.
Don Sixto is in Mendoza province’s Agua Escondida District, about 350 kilometers by road south of Mendoza city, Patagonia Gold said. The company describes gold-silver mineralization across six zones.
The project’s earlier work was halted amid provincial restrictions on chemicals used in conventional gold and silver processing. An Exeter Resource Corporation technical report from 2007 linked the suspension of exploration and engineering work to that legislation. Argentina’s official legal database records Mendoza Law 7,722 as enacted June 20, 2007, and describes it as prohibiting chemical substances in mineral extraction.
Patagonia Gold cited a historical 2007 estimate of 924,000 ounces of measured and indicated gold and 334,000 ounces inferred. The company said it has not verified the underlying data and does not regard the estimate as a current mineral resource. Exeter’s report lists 925,000 ounces for measured and indicated resources, a slightly different total.
The company said evaluating the project would involve legal, permitting, technical, environmental and economic work. It intends to assess the asset and engage with stakeholders; the announcement did not give a development plan or production schedule.



