ENDEAVOUR TO HOST WEBCAST FOR ITS ITY CIL PROJECT OPTIMIZATION STUDY
View News Release in PDF Format
George Town, September 14, 2017 - Endeavour Mining (TSX:EDV)(OTCQX:EDVMF) intends to publish the Optimization Study for its Ity CIL Project before TSX market open on September 20th, 2017, and host a conference call and live webcast on the same day at 9:30am Toronto time (EST).
The Optimization Study is expected to capture the value recently created through exploration, which has added 1.5 million ounces of Indicated Resources since the publication of the November 2016 Feasibility Study, representing a 65% increase.[1]
The conference call and live webcast are scheduled on Wednesday September 20th at:
9:30am Toronto time
6:30am in Vancouver
9:30am in Toronto and New York
2:30pm in London
9:30pm in Hong Kong and Perth
The live webcast can be accessed through the following link:
https://edge.media-server.com/m6/p/44r6ckra
Analysts and interested investors are also invited to participate and ask questions using the dial-in numbers below:
International: +1646 254 3360
North American toll-free: 1877 280 2342
UK toll-free: 0800 279 4992
Confirmation code: 5815693
The conference call and webcast will be available for playback on Endeavour's website.
Click here to add Webcast reminder to Outlook Calendar
CONTACT INFORMATION
| Martino De Ciccio VP - Strategy & Investor Relations + 44 203 011 2719 [email protected] | DFH Public Affairs in Toronto John Vincic, Senior Advisor (416) 206-0118 x.224 [email protected] Brunswick Group LLP in London Carole Cable, Partner +44 7974 982 458 [email protected] |
ABOUT ENDEAVOUR MINING CORPORATION
Endeavour Mining is a TSX-listed intermediate gold producer, focused on developing a portfolio of high quality mines in the prolific West-African region, where it has established a solid operational and construction track record.
Endeavour is ideally positioned as the major pure West-African multi-operation gold mining company, operating 5 mines across Côte d'Ivoire (Agbaou and Ity), Burkina Faso (Karma), Mali (Tabakoto), and Ghana (Nzema). In 2017, it expects to produce between 500koz and 530koz at an AISC of US$855 to US$900/oz, following the full-year deconsolidation of the discontinued Nzema mine. Endeavour is currently building its Houndé project in Burkina Faso, which is expected to commence production in Q4-2017 and to become its flagship low-cost mine with an average annual production of 190koz at an AISC of US$709/oz over an initial 10-year mine life, based on reserves. The development of the Houndé and Ity CIL projects are expected to lift Endeavour's group production to +900kozpa and decrease its average AISC to circa $800/oz by 2019, while exploration aims to extend all mine lives to +10 years.
Corporate Office: 5 Young St, Kensington, London W8 5EH, UK
This news release contains "forward-looking statements" including but not limited to, statements with respect to Endeavour's plans and operating performance, the estimation of mineral reserves and resources, the timing and amount of estimated future production, costs of future production, future capital expenditures, and the success of exploration activities. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "expects", "expected", "budgeted", "forecasts", and "anticipates". Forward-looking statements, while based on management's best estimates and assumptions, are subject to risks and uncertainties that may cause actual results to be materially different from those expressed or implied by such forward-looking statements, including but not limited to: risks related to the successful integration of acquisitions; risks related to international operations; risks related to general economic conditions and credit availability, actual results of current exploration activities, unanticipated reclamation expenses; changes in project parameters as plans continue to be refined; fluctuations in prices of metals including gold; fluctuations in foreign currency exchange rates, increases in market prices of mining consumables, possible variations in ore reserves, grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes, title disputes, claims and limitations on insurance coverage and other risks of the mining industry; delays in the completion of development or construction activities, changes in national and local government regulation of mining operations, tax rules and regulations, and political and economic developments in countries in which Endeavour operates. Although Endeavour has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. Please refer to Endeavour's most recent Annual Information Form filed under its profile at www.sedar.com for further information respecting the risks affecting Endeavour and its business. AISC, all-in sustaining costs at the mine level, cash costs, operating EBITDA, all-in sustaining margin, free cash flow, net free cash flow, free cash flow per share, net debt, and adjusted earnings are non-GAAP financial performance measures with no standard meaning under IFRS, further discussed in the section Non-GAAP Measures in the most recently filed Management Discussion and Analysis.
[1] Reference press release dated July 27, 2017, available on Endeavour's website.
Attachments:
http://www.globenewswire.com/NewsRoom/AttachmentNg/9f3316ee-5615-4c29-9f4f-77707a3e0451


OpenAI Expands Enterprise AI Strategy With Major Hiring Push Ahead of New Business Offering
Sony Q3 Profit Jumps on Gaming and Image Sensors, Full-Year Outlook Raised
SpaceX Pushes for Early Stock Index Inclusion Ahead of Potential Record-Breaking IPO
FDA Targets Hims & Hers Over $49 Weight-Loss Pill, Raising Legal and Safety Concerns
Nasdaq Proposes Fast-Track Rule to Accelerate Index Inclusion for Major New Listings
Prudential Financial Reports Higher Q4 Profit on Strong Underwriting and Investment Gains
Nvidia Nears $20 Billion OpenAI Investment as AI Funding Race Intensifies
Tencent Shares Slide After WeChat Restricts YuanBao AI Promotional Links
TSMC Eyes 3nm Chip Production in Japan with $17 Billion Kumamoto Investment
SoftBank Shares Slide After Arm Earnings Miss Fuels Tech Stock Sell-Off
Nintendo Shares Slide After Earnings Miss Raises Switch 2 Margin Concerns
Nvidia CEO Jensen Huang Says AI Investment Boom Is Just Beginning as NVDA Shares Surge
Global PC Makers Eye Chinese Memory Chip Suppliers Amid Ongoing Supply Crunch
Alphabet’s Massive AI Spending Surge Signals Confidence in Google’s Growth Engine
Missouri Judge Dismisses Lawsuit Challenging Starbucks’ Diversity and Inclusion Policies
AMD Shares Slide Despite Earnings Beat as Cautious Revenue Outlook Weighs on Stock
Nvidia, ByteDance, and the U.S.-China AI Chip Standoff Over H200 Exports 



